SmartLogger2000
User Manual
5 System Operation
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
74
Step 5
Switch on the upstream circuit breaker of the AC power cable.
Step 5
needs to be performed in the PLC networking scenario.
----End