
SmartLogger2000
User Manual
3 Device Installation
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
34
Tool
Model
Used To
Measuring tape
N/A
Measure distances.
Safety goggles
N/A
Protect the operator's eyes from
dust during hole drilling.
Anti-dust respirator
N/A
Protect an operator from dust
inhalation during hole drilling.
Heat gun
N/A
Heat-shrink a tube.
Cable tie
N/A
Bind cables.
3.4 Determining the Installation Position
Comply with the following requirements when determining the installation position for the
SmartLogger:
The SmartLogger has a protection level of IP20. It cannot be installed outdoors.
The SmartLogger should be installed in a dry environment to protect it from water.
The ambient temperature should be within the range of –40°C to +60°C. Avoid exposing
the SmartLogger to direct sunlight.