
SmartLogger2000
User Manual
8 Power Grid Scheduling
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
193
8.3 Reactive Power Adjustment
Before setting
Reactive power control mode
, set
Reactive power control
to
Enable
.
8.3.1 Disabling Reactive Power Output
If the PV plant is not required to adjust the voltage at the grid-tied point or perform reactive
power compensation, the inverter can run with pure active power output. In this case, set
Reactive power control mode
to
Disable reactive power output
.
Figure 8-9
Reactive power control
8.3.2 Dry Contact Remote Control
If ports of DI5–DI8 have been configured in
7.10.6 Remote Shutdown over Dry Contacts
or
Dry contact remote control
is unavailable.
Before setting dry contact remote control, ensure that the SmartLogger connects to a correct ripple
control receiver. For details, see
4.10 Connecting a Ripple Control Receiver
Set
Reactive power control mode
to
Dry contact remote control
.