2.
Pull out the server along the guide rails away from the cabinet. See (2) in
.
3.
Place the removed server on an ESD platform.
Step 5
Loosen the screws that secure a guide rail. See
.
Figure 3-32
Removing an L-shaped guide rail
Step 6
Remove the other guide rail on the opposite side in the same way.
----End
3.6.2 Removing a Server and Adjustable Guide Rail
Step 1
Wear an ESD wrist strap or ESD gloves. For details, see
Step 2
Power off the server. For details, see
4 Powering On and Off the Server
.
Step 3
Disconnect all power cables and signal cables from the server.
NOTE
Remove power cables first to prevent damage or injury caused by static electricity.
Step 4
Remove the server.
1.
Loosen the captive screws on the server panel using a screwdriver. See (1) in
.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3