![Huawei 5288 V3 V100R003 User Manual Download Page 165](http://html.mh-extra.com/html/huawei/5288-v3-v100r003/5288-v3-v100r003_user-manual_169672165.webp)
Step 2
Determine the rack number and chassis number of the server to be removed, and label its
panel to prevent misoperations.
Step 3
Power off the 5288 V3. For details, see
.
Step 4
Remove all external cables such as power and network cables.
Step 5
Remove the 5288 V3 and put it on an ESD desktop. For details, see
.
Step 6
Remove the chassis cover. For details, see
7.11 Removing the Chassis Cover
.
Step 7
Lift the riser card tray. See
.
Figure 7-40
Removing a riser card tray
Step 8
Remove the PCIe cards from the riser card tray. For details, see
.
Step 9
Loosen the screw on the riser card. See step (1) in
.
5288 V3 Server
User Guide
7 Replacing Parts
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
155