Figure 7-28
Installing the supercapacitor tray
Step 6
Install the chassis cover. For details, see
7.12 Installing the Chassis Cover
Step 7
Install the 5288 V3. For details, see
.
Step 8
Connect all internal cables such as power and network cables. For details, see
Step 9
Power on the 5288 V3. For details, see
----End
7.15 Removing a Fan Module
Remove a fan module before replacing it with a new one or removing other components (such
as the mainboard and DVD drive).
Procedure
Step 1
Wear an ESD wrist strap. For details, see
Step 2
Determine the rack number and chassis number of the server to be removed, and label its
panel to prevent misoperations.
NOTE
The fan modules are hot-swappable. You can skip steps
to
when you can open the chassis
cover without removing the server. The scenarios include but are not limited to: (1) the server is installed
on holding or adjustable guide rails and (2) the server is not installed in a cabinet.
Step 3
Power off the 5288 V3. For details, see
.
5288 V3 Server
User Guide
7 Replacing Parts
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
143