3.3 Unpacking the Chassis
The following tools must be available before the operation:
l
Protective gloves
l
ESD gloves or ESD wrist strap
l
Box cutter
Procedure
Step 1
Check whether the package and seals are in good condition.
NOTE
If the package is damaged (for example, the package is soaked or deformed, or the seals or pressure
sensitive adhesive tape is unsealed), fill in the
Cargo Problems Feedback Form
.
Step 2
Use a box cutter to cut the pressure-sensitive adhesive tape on the package, and open the
package.
Exercise caution when using a box cutter to avoid personal injury or equipment damage.
Step 3
Check the components against
and ensure that they are intact and free from
oxidation, corrosion, and damage.
Table 3-2
Packing items
No.
Description
1
Documentation bag that contains a warranty card, and a Quick Start Guide
2
A pair of guide rails
3
One rack server
----End
3.4 Installing the Server
This topic describes how to install a server on L-shaped guide rails, adjustable guide rails, and
holding rails. Choose an installation method based on site conditions.
Install a server if:
l
Additional servers are required in a cabinet for capacity expansion.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
55