Gx
Series
EN - 105
Fig. 38:
Connection of the EV-TEST100 adapter to the instrument and the EVSE system
Test 1
Continuity test of PE protective conductor of the EVSE system
5.
Press
GO/STOP
button to start the test sequence. The
screen to the side is shown on the display.
Connect the instrument to the adapter as shown in the
diagram on the display (input B4 on input
E
and input
B1
to the main earth collector of the system).
Act on
the three adapter selectors by setting the followed
positions as shown by the instrument by flashing
red/blue indications
:
PP State
NC
CP State
A
Fault
OK
Press the icon
to continue with the test or press the
icon
to exit the test and return to the initial screen
6. The RPE test is performed by the instrument
only in
AUTO mode
. Set the limit threshold value and calibrate
the measurement cables as shown in § 6.1
Press the
GO/STOP
button. The followed screen is
shown on the display