11. Install the air baffle.
•
•
12. For 2U server blade, install the top cover.
13. Install the server blade in the chassis.
14. Power up the server blade.
Removing and replacing the system board
Removing the system board
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1. Power down the server blade.
2. Remove the server blade from the chassis.
3. For 2U server blade, remove the top cover.
4. Remove the air baffle:
•
•
5. Remove all DIMMs.
6. If installed, remove these options from the system board.
Removal and replacement procedures
167
Summary of Contents for ProLiant e910
Page 148: ...148 Customer self repair...
Page 149: ...Customer self repair 149...
Page 150: ...150 Customer self repair...