Procedure
1. Power down the server blade.
2. Remove the server blade from the chassis.
3. Remove the 1U air baffle.
Installing the air baffle for 1U server blade
Procedure
1. Install the air baffle.
2. Install the server blade in the chassis.
Operations
21
Summary of Contents for ProLiant e910
Page 148: ...148 Customer self repair...
Page 149: ...Customer self repair 149...
Page 150: ...150 Customer self repair...