d. If you are installing a second SSD, repeat steps a–c.
8.
For 2U server blade, do the following:
9.
Install the server blade in the chassis.
10. Power up the server blade.
GPU power enablement option
This option is available for the 2U server blade.
Installing the GPU power enablement option
The server blade supports PCI card, PCIe card and GPU. If these expansion cards have additional power requirement, the GPU
power enablement option is installed.
Procedure
1.
2.
Remove the server blade from the chassis.
3.
4.
Disassemble the top cover.
32 Hardware options installation
Summary of Contents for ProLiant e910
Page 148: ...148 Customer self repair...
Page 149: ...Customer self repair 149...
Page 150: ...150 Customer self repair...