
326
Appendix A
Configuration Planning Worksheets
User Application Support Worksheets
User Application Support Worksheets
Complete the following worksheets if the corresponding user-level
applications are to be supported by the local node:
• “APPC”
• “CPI-C”
• “5250”
• “3270”
• “RJE”
• “LUA”
APPC
Complete this worksheet if the local node is to support APPC
applications.
Motif Field
Valid Entry/Notes
Your
Implementation
Value
Node Configuration: See “Node Worksheets”.
Connectivity Configuration: See “Connectivity Worksheets”.
Local LU Dialog: Not required if you can use the default control point LU.
LU name
1–8 type A EBCDIC characters
LU alias
Up to 8 characters
Dependent LU parameters
Host LS/DLUR PU
Name of dependent link station to
host or DLUR PU (must be defined
before defining an LU)
Summary of Contents for HP-UX SNAplus2
Page 4: ...4 ...
Page 14: ...14 Contents ...
Page 22: ...22 ...
Page 23: ...23 1 SNA Terms and Concepts ...
Page 65: ...65 2 Introduction to SNAplus2 ...
Page 107: ...107 3 Administering SNAplus2 ...
Page 132: ...132 Chapter3 Administering SNAplus2 Using the Command Line Administration Program ...
Page 133: ...133 4 Basic Configuration Tasks ...
Page 142: ...142 Chapter4 Basic Configuration Tasks Configuring Logging ...
Page 143: ...143 5 Defining Connectivity Components ...
Page 167: ...167 6 Configuring Dependent LUs ...
Page 174: ...174 Chapter6 Configuring Dependent LUs Defining LU Pools ...
Page 175: ...175 7 Configuring APPC Communication ...
Page 208: ...208 Chapter7 Configuring APPC Communication Configuring APPC Security ...
Page 209: ...209 8 Configuring User Applications ...
Page 222: ...222 Chapter8 Configuring User Applications Configuring RJE Workstations ...
Page 223: ...223 9 Configuring Passthrough Services ...
Page 235: ...235 10 Managing SNAplus2 from NetView ...
Page 248: ...248 Chapter10 Managing SNAplus2 from NetView Using UCF ...
Page 249: ...249 11 Managing SNAplus2 Clients ...
Page 300: ...300 Chapter11 Managing SNAplus2 Clients Managing HP UX Clients ...
Page 301: ...301 A Configuration Planning Worksheets ...
Page 337: ...337 B APPN Network Management Using the Simple Network Management Protocol ...
Page 343: ...343 C Configuring an Invokable TP Using snaptpinstall ...
Page 353: ...353 D Using SNAplus2 in a High Availability Environment ...