
Appendix B
Installation Checklist
Using the Checklist
155
Verify presence of UGUY and
cells
Power on cabinet (48 V)
Verify system configuration
and set boot parameters
Set automatic system restart
Run JUST software
Boot partitions (refer to
Table 4-1 on page 87)
List partitions to boot
List primary boot path for
each partition
Check boot paths with
customer and revise as
necessary
List logical cell number
List physical cabinet # of
cell
List cell slot # within
cabinet
List boot device adapter
physical location in card
cage (slot, cabinet, I/O Bay,
and I/O chassis)
Install boot device (if
required)
Power down cell for each
partition
Connect boot device cable
for each partition
Power up cell for each
partition
Boot HP-UX for each
partition
Configure remote login (if
required). See Appendix D.
Verify remote link (if required).
See Appendix D.
Table B-1
Factory-Integrated Installation Checklist
(Continued)
(Continued)
PROCEDURE
IN-PROCESS
COMPLETED
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...