Chapter 3
Preparing Superdome for Booting
Moving the Superdome System and Related Equipment to the Installation Site
30
Moving the Superdome System and Related Equipment to the
Installation Site
Carefully move the SPU cabinet (or cabinets, if there are more than one) and its related equipment to the
installation site, but not into its final location. (If the system is to be placed at the end of a row, you will need
to add side bezels before positioning the cabinet in its final location.) Check the path from where the system
was unpacked to its final destination to make sure the way is clear and free of obstructions. If you are
required to move the cabinet up ramps, be sure to maneuver it using three people.
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...