2. Click Correct Check-In/Out to enter adding the check-in/out
correction page.
3. Select person from left list for correction.
4. Select the correction date.
5. Set the check-in/out correction parameters.
-
Select Check-in and set the actual start-work time.
-
Select Check-out and set the actual end-work time.
Note
You can click to add multiple check in/out items. At most 8
check-in/out items can be supported.
6. Optional: Enter the remark information as desired.
7. Click Save.
8. Optional: After adding the check-in/out correction, perform
one of the following operations.
View
Click or to view the added attendance
handling information in calendar or list mode.
Note
In calendar mode, you need to click Calculate to get
the attendance status of the person in one month.
Edit
• In calendar mode, click the related label on date
to edit the details.
• In list mode, double-click the related filed in
Date, Handling Type, Time, or Remark column to
edit the information.
Delete Delete the selected items.
Export Export the attendance handling details to local PC.
Note
The exported details are saved in CSV format.
9.7.6 Add Leave and Business Trip
You can add leave and business trip when the employee want to
ask for leave or go on a business trip.
Before You Start
You should add organizations and persons in the Person module.
For details, refer to Person Management.
Steps
1. Click Time & Attendance Attendance Handling to enter
attendance handling page.
2. Click Apply for Leave/Business Trip to enter adding the leave/
business trip page.
3. Select person from left list.
4. Set the date(s) for your leave or business trip.
5. Select the major leave type and minor leave type from the
drop-down list.
88
Summary of Contents for DS-K1T605 Series
Page 1: ...Face Recognition Terminal UD07930B E...
Page 104: ...95...
Page 105: ...C Relationship between Device Height Person Height and Standing Distance 96...
Page 107: ...E Dimension 98...