◦
The slot locations in which each memory module is installed. These components must be installed in the same
locations on the new system board.
◦
The port numbers and cable connections between the system board and the secondary riser board.
• Before you perform this procedure, make sure that you have a T-15 and T-30 Torx screwdrivers available.
Procedure
1.
2.
Disconnect all peripheral cables from the server.
3.
Remove the server from the chassis.
4.
5.
Do one of the following:
•
Remove the secondary riser blank.
•
Remove the secondary riser cage.
6.
Do one the following:
•
Remove the primary riser blank.
•
Remove the primary riser cage.
7.
If installed,
remove the Media Module adapter.
8.
If installed,
remove the M.2 SSD riser board.
9.
disconnect the S100i SR Gen10 controller SATA X-cable.
10. Remove the DIMMs from the system board.
11. Remove the processor heatsink assembly:
a. Allow the heatsink to cool.
b. Loosen the heatsink nuts in the order specified by the label on the heatsink.
Removal and replacement procedures
63
Summary of Contents for HPE ProLiant XL170r Gen10
Page 6: ...Acronyms and abbreviations 128 6...
Page 22: ...22 Customer self repair...
Page 23: ...Customer self repair 23...
Page 24: ...24 Customer self repair...