Install the server into the chassis
CAUTION: To avoid damage to the server or server blank:
• Always support the bottom of the server or server blank when removing it from the chassis.
• Do not use the release lever to carry the server or server blank.
Procedure
1. Slide the server into the chassis.
2. Close the release lever.
3. Tighten the release lever thumbscrew.
4. Connect all peripheral cables to the server.
Power up the server
The SL/XL chassis firmware initiates an automatic power-up sequence when the servers are installed. If the default setting
is changed, use one of the following methods to power up each server:
• Use a virtual power button selection through iLO 5.
• Press and release the Power On/Standby button.
When the server goes from standby mode to full power mode, the server power LED changes from amber to green.
40
Removal and replacement procedures
Summary of Contents for HPE ProLiant XL170r Gen10
Page 6: ...Acronyms and abbreviations 128 6...
Page 22: ...22 Customer self repair...
Page 23: ...Customer self repair 23...
Page 24: ...24 Customer self repair...