3 - Description
3.18
2. 1. 4.
21
Extra sensor 4A
Readout from extra sensor 4 analog
2. 1. 4.
22
Voltmeter
Displays system voltage. Useful when fault finding
2. 1. 4.
23
Agitation
Agitation valve opening
2. 1. 4.
24
RinseTank content
RinseTank calculated content
2. 1. 4.
25
Slant angle
Headland assist angle sensor
2. 1. 4.
26
Boom height
Headland assist height sensor
2. 1. 4.
27
Reserved
R R
2. 1. 4.
28
Reserved
R R
2. 1. 4.
29
Reserved
R R
2. 1. 4.
30
Reserved
R R
2. 1. 4.
31
Reserved
R R
2. 1. 4.
32
Reserved
R R
2. 1. 4.
33
Nozzle size flow at 3 bar (45 psi)
Calculated nozzle flow at 3 bar (45 psi)
2. 1. 4.
34
2. 1. 4.
35
2. 1. 4.
36
2. 1. 4.
37
PF bus +
Voltage on PrimeFlow d
2. 1. 4.
38
PF bus -
Voltage on PrimeFlow databus -
2. 1. 5
Show ESC softkey to leave
ISObus terminal can have a separate ESC key or use an ESC softkey
2. 1. 5.
1
Show ESC as softkey
Choose this to show ESC key as softkey on ISObus terminal
2. 1. 5.
2
Do not show ESC as softkey
Choose this if ISObus terminal has a separate ESC key.
2. 2
AUTO functions
Set up for Auto ON/OFF, Foam marker, HeadlandAssist and optional A/B
2. 2. 1
Main ON/OFF
For automatic operation of the main ON/OFF function at a pre-set speed
2. 2. 2
Foam marker
To operate via the main ON/OFF function and automate side choice
2. 2. 2.
1
Disable
It will only follow the manual setting of the switch on the SetBox
2. 2. 2.
2
Same side
It will automatically activate the same side for race-track spraying
2. 2. 2.
3
Change side
It will automatically change side for up and back spraying
2. 2. 3
Dual Line
To set up lower and upper trigger limits for the operation of line A and line B
2. 2. 3.
1
Lower pressure level
Key in pressure level to switch Dual Line to smaller nozzles
2. 2. 3.
2
Upper pressure level
Key in pressure level to switch Dual Line to bigger nozzles
2. 2. 3.
3
From A to B speed level
Key in speed to switch Dual Line from A to B
2. 2. 3.
4
From B to A+B speed level
Key in speed to switch Dual Line from B to A+B
2. 2. 4
HeadlandAssist setup
Boom lift and lower automatically when switching main ON/OFF function
2. 2. 4.
1
ON/OFF delay
Distance delay so the boom will lift or lower via the main ON/OFF
2. 2. 4.
2
Boom height at headlands
Key in 0 to disable HeadlandAssist Key in a height to enable
2. 2. 4.
3
Slant mirror or in steps
Activate headland assist slant mirror or slant in steps.
2. 2.
4. 3. 1
Slant mirror and steps disable
Traditional slant. No slant mirror. No slant in steps.
2. 2.
4. 3. 2
Slant mirror enable
Activate opposite slant at headlands. Slant in steps not possible.
2. 2.
4. 3. 3
Slant in steps enable
Activate slant in steps. Set step size in 2.2.4.4. Slant mirror not possible.
2. 2. 5
TWIN preset shift auto / man
Shifts automatically at main ON/OFF or manually at keypress
2. 2. 5.
1
Manual shift at keypress
Upon keypress it will change to the other preset value
2. 2. 5.
2
Auto shift at main ON/OFF
It will automatically change to the other preset value
2. 2. 5.
3
TWIN controls disabled
TWIN fan, angle and preset controls are disabled
2. 2. 6
AutoAgitation select level
Powerful or soft no Agitation
2. 2. 6.
1
Powerful AutoAgitation
Recommended for powder
2. 2. 6.
2
Soft AutoAgitation
Recommended for liquid chemical
2. 2. 6.
3
No agitation
Never use if sedimentation occurs. Recommended for liquid fertilizer.
2. 2. 6.
4
Fixed agitation
Valve is positioned
2. 2. 6.
5
Agitation switch
Switch increase or decrease agitation
2. 2. 7
AutoAgitation fixed level
Key in position of agitation valve for FluidBox key and fixed level
2. 3
VRA / Remote control
Variable Rate Application by RS232 Auto Section Control
2. 3. 1
VRA / Remote control disable
Variable Rate Application / Remote control disabled. Dish icon disappear
2. 3. 2
VRA / Remote control enable
by RS232 data port control enabled. Dish icon will be shown
2. 4
Set clock
Change date and clock time
2. 4. 1
Time format (12 or 24 hour)
Choose between a 12 hour or 24 hour clock
2. 4. 1.
1
12 hour format
You have chosen 12 hours as your time unit
2. 4. 1.
2
24 hour format
You have chosen 24 hours as your time
Summary of Contents for ISOBUS VT
Page 2: ......
Page 4: ......
Page 8: ...Table of contents TOC 4 ...
Page 10: ...1 Welcome 1 2 ...
Page 12: ...2 Safety notes 2 2 ...
Page 48: ...5 Menu 1 Daily settings 5 2 ...
Page 52: ...6 Menu 2 Setup 6 4 ...
Page 74: ...8 Menu 4 Toolbox 8 4 ...
Page 78: ...10 Maintenance 10 2 ...
Page 103: ......