Modifications reserved
Page 46/103
OPM_LPS_33E_60K_M12_2GB_V010.doc
Operating Manual
LP 33 Series 60-80-100-120 kVA / S2
LPS
33_0
40-1
20_R
PA c
on
nec
tion
_G
E_02
J4
J3
LP 33 Series
1
P1
P13
P34
P1
J3
P13
J4
P34
LP 33 Series
2
J3
P1
P13
J4
P34
LP 33 Series
3
P34
J4
J3
P1
P13
LP 33 Series
4
Fig. 5.8.7-3 Bus connection RPA Parallel System
Bus connection RPA Parallel System
Connect the control bus cable between the parallel units as indicated in the diagram
Fig. 5.8.7-3
.
NOTE !
Provide that the connectors
J3
and
J4
are properly fixed with the included screws.
L
P
S
3
3_
040
-120
_R
PA
c
o
nne
ct
ion_
03
JP1
JP2
JP3
P1
J3
P13
J4
P34
Fig. 5.8.7-4 Connection to board “P34 – Connector adapter RPA“
NOTE !
The jumper
JP1 - JP2 - JP3
must be removed only on the intermediate units, where
the connectors
J3
and
J4
are both inserted.
Do not insert or remove
J3
and
J4
from the board
“P34 - Connector adapter RPA”
when the
Parallel System
is operating.
NOTE !
Connection and commissioning of an additional UPS to an existing
Parallel System
,
must be performed by a service engineer from of your
Service Centre.