Modifications reserved
Page 98/103
OPM_LPS_33E_60K_M12_2GB_V010.doc
Operating Manual
LP 33 Series 60-80-100-120 kVA / S2
Output signals on voltage-free contacts
On terminals
X1
or
J2
connector
6 of the following 28 signals
can be selected from the display
(access only with password):
SETUP / SETUP /
LEVEL 2: SERVICE
.
0 - No signal
15 - Battery discharge
1 - Buzzer
16 - Manual bypass ON
2 - General alarm (NO)
17 - Rectifier ON
3 - Load on mains
18 - Inverter ON
4 - Stop operation
19 - Battery boostcharge
5 - Load on inverter
20 - Battery earth fault
6 - Mains failure
21 - Battery fault
7 - DC overvoltage
22 - Relay input 1
8 - Low battery
23 - Relay input 2
9 - Overload
24 - Relay output ON
10 - Overtemperature
25 - Relay output OFF
11 - Inverter-mains not syncrony
26 - EPO (Emergency Power Off)
12 - Bypass locked
27 -
ECO Mode
ON
13 - Bypass mains failure
28 - General alarm (NC)
14 - Rectifier mains failure
Programmable functions on input contacts (X1 - J2)
Some UPS functions can be activated by parameters (access with password only) when an external
NO contact is closed on:
No function
Inverter On
Inverter OFF
Generator ON
Print all
Status relay
External bypass ON
External battery fuses
Voltage free contacts:
Max. DC / AC: 24V / 1.25A
IEC 60950 (SELV circuit)
Min. signal level: 5Vdc / 5mA
Gen Set signalling
If an Emergency generator set supplies the UPS in case of utility failure and the generator is particularly
unstable in frequency, it should be suitable to install the signal “generator on” on terminals
X1 / 11, 22
(Normally Open voltage-free contact) or on connector
J2 / 11, 24
(see
Fig. 10.2.1-1 / X1
and
J2
).
Since the Parameter for of the reading of the Generator function is password protected, call the nearest
Service Centre
for it's activation.
When this contact closes, it causes the change of certain settable functions such as:
•
Enabling or disabling of synchronisation and consequently the load transfer to generator.
•
The battery recharge inhibition during the generator operation, or after what delay from generator
start the battery will start to be recharged.
Consult your nearest
Service Centre
for more information.
In a Parallel System a separate NO (Normally Open) contact must be connected to
each individual unit.