8.1.5 Restore to normal operation after “Total Off”
NOTE !
Make sure the UPS to be status of the activation of “
Total Off”
, i. e.
Q1
closed,
Q2
open and the
external battery fuses
connected.
View of the
synoptic diagram
after pressing the “
Total Off” key
:
•
All
Contactors
are open.
•
Booster, Inverter
and
Static-Switch
shutdown.
`
Home\Commands
COMMANDS
RESET TOTAL OFF
REQUEST TOTAL OFF
1. Reset
“
Total Off”.
Restore the command
“Total Off”
by entering the screen:
COMMANDS /
RESET TOTAL OFF
LED Alarm
is lit.
V
The load is supplied by the
mains
through the
automatic
bypass
.
The
booster
starts automatically.
The
synoptic diagram
must display the status
“
LOAD
SUPPLIED BY AUTOMATIC BYPASS
”
.
2. Insert the inverter by pressing
“
Inverter ON
”
( I ) key.
Some seconds later the
load
will be transferred on
inverter
.
LED Alarm
turn Off and the
LED Operation
must be lit.
The
synoptic diagram
must display the status
“
LOAD
SUPPLIED BY INVERTER
”
.
END OF PROCEDURE