5-326
L60 Line Phase Comparison System
GE Multilin
5.9 TESTING
5 SETTINGS
5
5.9.3 FORCE CONTACT OUTPUTS
PATH: SETTINGS
TESTING
FORCE CONTACT OUTPUTS
The relay contact outputs can be pre-programmed to respond to the test mode.
If set to “Disabled”, the contact output remains fully operational. If operates when its control operand is logic 1 and will
resets when its control operand is logic 0. If set to “Energized”, the output will close and remain closed for the entire dura-
tion of the test mode, regardless of the status of the operand configured to control the output contact. If set to “De-ener-
gized”, the output will open and remain opened for the entire duration of the test mode regardless of the status of the
operand configured to control the output contact. If set to “Freeze”, the output retains its position from before entering the
test mode, regardless of the status of the operand configured to control the output contact.
These settings are applied two ways. First, external circuits may be tested by energizing or de-energizing contacts. Sec-
ond, by controlling the output contact state, relay logic may be tested and undesirable effects on external circuits avoided.
Example 1: Initiating test mode through user-programmable pushbutton 1
For example, the test mode can be initiated from user-programmable pushbutton 1. The pushbutton will be programmed as
“Latched” (pushbutton pressed to initiate the test, and pressed again to terminate the test). During the test, contact input 1
should remain operational, contact inputs 2 and 3 should open, and contact input 4 should close. Also, contact output 1
should freeze, contact output 2 should open, contact output 3 should close, and contact output 4 should remain fully opera-
tional. The required settings are shown below.
To enable user-programmable pushbutton 1 to initiate the test mode, make the following changes in the
SETTINGS
TESTING
TEST MODE
menu:
TEST MODE FUNCTION:
“Enabled” and
TEST MODE INITIATE:
“
PUSHBUTTON 1 ON
”
Make the following changes to configure the contact inputs and outputs. In the
SETTINGS
TESTING
FORCE CONTACT
INPUTS
and
FORCE CONTACT OUTPUTS
menus, set:
FORCE Cont Ip 1:
“Disabled”,
FORCE Cont Ip 2:
“Open”,
FORCE Cont Ip 3:
“Open”, and
FORCE Cont Ip 4:
“Closed”
FORCE Cont Op 1:
“Freeze”,
FORCE Cont Op 2:
“De-energized”,
FORCE Cont Op 3:
“Energized”,
and
FORCE Cont Op 4:
“Disabled”
Example 2: Initiating a test from user-programmable pushbutton 1 or through remote input 1
In this example, the test can be initiated locally from user-programmable pushbutton 1 or remotely through remote input 1.
Both the pushbutton and the remote input will be programmed as “Latched”. Write the following FlexLogic equation:
Set the user-programmable pushbutton as latching by changing
SETTINGS
PRODUCT SETUP
USER-PROGRAMMABLE
PUSHBUTTONS
USER PUSHBUTTON 1
PUSHBUTTON 1 FUNCTION
to “Latched”. To enable either pushbutton 1 or remote
input 1 to initiate the Test mode, make the following changes in the
SETTINGS
TESTING
TEST MODE
menu:
TEST MODE FUNCTION:
“Enabled” and
TEST MODE INITIATE:
“
VO1
”
FORCE CONTACT
OUTPUTS
FORCE Cont Op 1
:Disabled
Range: Disabled, Energized, De-energized, Freeze
MESSAGE
FORCE Cont Op 2
:Disabled
Range: Disabled, Energized, De-energized, Freeze
MESSAGE
FORCE Cont Op xx
:Disabled
Range: Disabled, Energized, De-energized, Freeze
Summary of Contents for L60
Page 10: ...x L60 Line Phase Comparison System GE Multilin TABLE OF CONTENTS ...
Page 57: ...GE Multilin L60 Line Phase Comparison System 2 27 2 PRODUCT DESCRIPTION 2 3 SPECIFICATIONS 2 ...
Page 58: ...2 28 L60 Line Phase Comparison System GE Multilin 2 3 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Page 482: ...6 26 L60 Line Phase Comparison System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 554: ...10 8 L60 Line Phase Comparison System GE Multilin 10 2 BATTERIES 10 MAINTENANCE 10 ...
Page 674: ...B 110 L60 Line Phase Comparison System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 704: ...C 30 L60 Line Phase Comparison System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Page 720: ...E 10 L60 Line Phase Comparison System GE Multilin E 1 PROTOCOL APPENDIX E E ...
Page 732: ...F 12 L60 Line Phase Comparison System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Page 742: ...H 8 L60 Line Phase Comparison System GE Multilin H 3 WARRANTY APPENDIX H H ...