Chapter 1: Getting Started
7
Installing the CPU drawer
If the rails have not been mounted on the processor drawer at the factory,
you must install them. The brackets must be installed in the rack.
Requirements for installation of the drawer are listed below.
•
This CPU drawer is an 4U system, meaning that it requires 7
vertical inches (1.75" x 4") of rack space for installation. Check
your rack configuration to make sure you have at least this much
space. You may have to remove blank panels or rearrange existing
drawers to provide enough clearance.
•
Protect your system from extreme temperature and humidity.
Position your rack away from direct sunlight, heater ducts, and
other heat-generating objects.
•
Keep your system away from equipment that generates magnetic
fields. Even a telephone placed too closely to the system may
cause interference.
•
Your new system drawer is configured for AC operation. Protect it
against AC line spikes by using a 3-prong, 110 V or 220 V
(depending on the voltage supplied in your locality), and an AC
surge control outlet station. The system requires two separate AC
outlets (one per power supply).
Inspecting the contents
Unpack the carton and inspect the contents. Standard systems include the
following items:
•
System Drawer
•
Power Cables
•
User’s Guide
•
Software Utilities (Diskettes or CD)
Check the packing list to ensure all equipment and associated manuals are
included in your shipment. Inspect everything carefully. If you suspect any
damage from shipping, contact technical support immediately
.
Note:
Drawer heights are
measured in “U’s.” Each U
is 1.75
"
, measured
vertically on the rack.
Important!
Keep the product carton
and foam packing, in case
you have to ship the
system. If you return the
system in different
packaging, your warranty
may be voided.
9250R.book Page 7 Friday, April 9, 1999 9:44 AM
Summary of Contents for ALR 9250R
Page 7: ...Contents v Index 193 9250R book Page v Friday April 9 1999 9 44 AM...
Page 8: ...vi Gateway ALR 9250R User s Guide 9250R book Page vi Friday April 9 1999 9 44 AM...
Page 14: ...xii Gateway ALR 9250R User s Guide 9250R book Page xii Friday April 9 1999 9 44 AM...
Page 34: ...20 Gateway ALR 9250R User s Guide 9250R book Page 20 Friday April 9 1999 9 44 AM...
Page 56: ...42 Gateway ALR 9250R User s Guide 9250R book Page 42 Friday April 9 1999 9 44 AM...
Page 114: ...100 Gateway ALR 9250R User s Guide 9250R book Page 100 Friday April 9 1999 9 44 AM...
Page 134: ...120 Gateway ALR 9250R User s Guide 9250R book Page 120 Friday April 9 1999 9 44 AM...
Page 164: ...150 Gateway ALR 9250R User s Guide 9250R book Page 150 Friday April 9 1999 9 44 AM...
Page 186: ...172 Gateway ALR 9250R User s Guide 9250R book Page 172 Friday April 9 1999 9 44 AM...
Page 194: ...180 Gateway ALR 9250R User s Guide 9250R book Page 180 Friday April 9 1999 9 44 AM...
Page 206: ...192 Gateway ALR 9250R User s Guide 9250R book Page 192 Friday April 9 1999 9 44 AM...
Page 226: ...212 Gateway ALR 9250R User s Guide 9250R book Page 212 Friday April 9 1999 9 44 AM...