Questions? Please Contact Your Local Manufacturer’s Representative
3-31
SECTION 3
ModSyncSE-User-Manual-211020
OPERATION
!
WARNING
This manual is provided as a
guide to the correct operation and
maintenance of your equipment,
and should be read in its entirety and
be made permanently available to
the staff responsible for equipment
operation. It should not, however
be considered as a complete code
of practice, nor should it replace
existing codes or standards which
may be applicable. Fulton reserves
the right to change any part of
this installation, operation and
maintenance manual without notice.
Do not install, operate, service,
or repair any component of this
equipment unless you are qualified
and fully understand all requirements
and procedures.
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional /professional codes or
regulations
Lead / Lag Configuration 3
FIGURE 30 – LEAD / LAG SCREENS PAGE 3
Modulation at Next Stage CV:
Defines the firing rate of the boiler before
each consecutive stage. For example if the Modulation at Next Stage CV is
20% when the lead boiler is running then the ModSync® will allow it to run
up to a 20% firing rate before it brings on the lag 1 boiler.
1st Lag Stage Start CV:
Defines the CV (as generated by the PID) that
enables the lag 1 boiler. This will also determine the point at which the
lead boiler will be at the Modulation at Next Stage firing rate %.
1st Lag Stage Stop CV:
Defines the CV (as generated by the PID) that
disables the lag 1 boiler.
Additional Lag Enabled CV:
Additional CV percentage that is added to
the 1st lag stage start CV and 1st lag stage stop CV for each additional
boiler.
Boiler
Position
Lead
Lag 1
Lag 2
Lag 3
Lag 4
Start CV:
0%
20%
30%
40%
50%
Stop CV:
0%
10%
20%
30%
40%
Example start and stop CV percentages based on the settings in Figure 29