© Fulton Group N.A., Inc. 2021
3-8
OPERATION
ModSyncSE-User-Manual-211020
SECTION 3
!
WARNING
This manual is provided as a
guide to the correct operation and
maintenance of your equipment,
and should be read in its entirety and
be made permanently available to
the staff responsible for equipment
operation. It should not, however
be considered as a complete code
of practice, nor should it replace
existing codes or standards which
may be applicable. Fulton reserves
the right to change any part of
this installation, operation and
maintenance manual without notice.
Do not install, operate, service,
or repair any component of this
equipment unless you are qualified
and fully understand all requirements
and procedures.
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional /professional codes or
regulations
System and Scaling Screen 1
`
LEAD/LAG CONFIGURATION
Rotation Priority:
Selects which value is compared to determine the lead
lag sequence based on the number of run hours or number of boiler cycles
in order to equalize wear across the boiler plant.
Forced Rotation:
When Enabled the ModSync® will allow for boilers to
rotate while there is a call for heat on the system.
Forced Selection:
Only selectable when Forced rotation is enabled allows
User input on when the boilers are allowed to rotate. Based on run hours,
daily time, or weekly day/time.
`
SYSTEM CONFIGURATION
Number of Boilers:
Allows the user to select the number of boilers being
controlled by the ModSync®. The ModSync® SE is capable of controlling up
to 8 boilers.
Screen Contrast:
Adjusts the brightness of the screen. 20 – darkest, 100 –
brightest.
Temp Scaling:
Change the ModSync® between Celsius and Fehrenheit.
Modulation Mode:
Determines how the ModSync® will control the boilers.
Time/Date:
Allows for time/date to be adjusted.
FIGURE 6 – SYSTEM AND SCALING SCREEN 1