© Fulton Group N.A., Inc. 2021
3-20
OPERATION
ModSyncSE-User-Manual-211020
SECTION 3
!
WARNING
This manual is provided as a
guide to the correct operation and
maintenance of your equipment,
and should be read in its entirety and
be made permanently available to
the staff responsible for equipment
operation. It should not, however
be considered as a complete code
of practice, nor should it replace
existing codes or standards which
may be applicable. Fulton reserves
the right to change any part of
this installation, operation and
maintenance manual without notice.
Do not install, operate, service,
or repair any component of this
equipment unless you are qualified
and fully understand all requirements
and procedures.
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional /professional codes or
regulations
Maintenance Configuration Screen 1
The ModSync® will keep its own count of Cycles and Hours for each boiler. The
Maintenance Configuration Screen 1 shows the current Cycles and Hour counts
for all available boilers. The value can be manually adjusted to match the actual
Cycle and Hour counts from the boilers.
FIGURE 16 – MAINTENANCE CONFIGURATION SCREEN 1
Maintenance Configuration Screen 2
The ModSync® has an optional run hour monitor to keep track of when
preventive maintenance is recommended. This function is for display purposes
only and does not affect the operation of the boilers. In order to reset the
remaining hours press and hold the last serviced button for 5 seconds.
FIGURE 17 – MAINTENANCE CONFIGURATION SCREEN 2