TX300 S8 / RX350 S8
Upgrade and Maintenance Manual
729
Converting a tower server to a rack server
Ê
If applicable, reinstall all hard disk drives and HDD dummy modules into
their original slots in the HDD extension box as described in the following
sections:
–
"Installing 2.5-inch HDD / SSD modules" on page 207
–
"Installing a 2.5-inch HDD / SSD dummy module" on page 213
–
"Installing 3.5-inch HDD modules" on page 254
–
"Installing a 3.5-inch HDD dummy module" on page 261
Ê
Reinstall all accessible drive filler covers and front covers as described in
section
"Installing accessible drive dummy covers" on page 548
.
15.9 Assembling the rack front cover
Figure 572: Rack mounting brackets with quick release levers
I
The rack front cover consists of a plastic frame and two rack mounting
brackets with quick release levers.
Summary of Contents for PRIMERGY RX350 S8
Page 6: ...Upgrade and Maintenance Manual TX300 S8 RX350 S8 ...
Page 44: ...44 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Before you start ...
Page 160: ...160 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Basic software procedures ...
Page 182: ...182 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Power supply ...
Page 320: ...320 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Hard disk drives solid state drives ...
Page 344: ...344 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Fans ...
Page 484: ...484 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Main memory ...
Page 528: ...528 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Processors ...
Page 644: ...644 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Front panel and external connectors ...
Page 792: ...792 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Appendix ...