116
Upgrade and Maintenance Manual
TX300 S8 / RX350 S8
Basic hardware procedures
V
CAUTION!
Additionally, a lifter is required in the following cases:
– The server weighs more than 50 kg.
– The server weighs more than 21 kg and is to be installed above the
height of 25 U.
When using a lifter, this installation procedure needs to be carried out by
maintenance personnel.
I
Refer to the rack cabinet manuals for more detailed information on other
support systems.
Ê
If required, install the rack mounting bracket and rack system into the rack
as described in the "Rack Mounting Kit - RMK-F2 Drop-In" Mounting
Instructions.
I
The printed poster is contained in the rack mounting kit.
Figure 64: Mounting the server onto the rack rails
Ê
Fully extend the telescopic rails until they lock in place (1).
Ê
At a slight angle, lower the server onto the rear mounting point on the
telescopic rails (2).
Summary of Contents for PRIMERGY RX350 S8
Page 6: ...Upgrade and Maintenance Manual TX300 S8 RX350 S8 ...
Page 44: ...44 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Before you start ...
Page 160: ...160 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Basic software procedures ...
Page 182: ...182 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Power supply ...
Page 320: ...320 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Hard disk drives solid state drives ...
Page 344: ...344 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Fans ...
Page 484: ...484 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Main memory ...
Page 528: ...528 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Processors ...
Page 644: ...644 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Front panel and external connectors ...
Page 792: ...792 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Appendix ...