118
Upgrade and Maintenance Manual
TX300 S8 / RX350 S8
Basic hardware procedures
4.13 Connecting the server to the mains
The PRIMERGY TX300 S8 / RX350 S8 server can be equipped with up to four
hot-plug PSU modules that automatically adjust to any mains voltage in the
range of 100 VAC to 240 VAC. Power redundancy is possible in various PSU
configurations (see section
"PSU installation sequence" on page 164
).
V
CAUTION!
The server supports a mains voltage in the range of 100 VAC to
240 VAC. You may only operate the server if its rated voltage range
corresponds to the local mains voltage.
Ê
Connect the power cords to the power supply units.
Ê
Connect the mains plugs to grounded mains outlets in the in-house power
supply network or power outlets of the rack socket strip (see also
"PRIMECENTER Rack System" assembly guide).
I
It will take about 60 seconds until the server can be powered on.
4.13.1 Securing power cords
4.13.1.1 Mounting a PSU cable bracket
If the PSU cable bracket has not yet been mounted to the power supply module,
proceed as follows:
Figure 66: Preparing the PSU cable bracket
Summary of Contents for PRIMERGY RX350 S8
Page 6: ...Upgrade and Maintenance Manual TX300 S8 RX350 S8 ...
Page 44: ...44 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Before you start ...
Page 160: ...160 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Basic software procedures ...
Page 182: ...182 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Power supply ...
Page 320: ...320 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Hard disk drives solid state drives ...
Page 344: ...344 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Fans ...
Page 484: ...484 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Main memory ...
Page 528: ...528 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Processors ...
Page 644: ...644 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Front panel and external connectors ...
Page 792: ...792 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Appendix ...