TX300 S8 / RX350 S8
Upgrade and Maintenance Manual
229
Hard disk drives / solid state drives
7.2.10 Upgrading to 16x 2.5-inch HDD / SSD
configurations
7.2.10.1 Preliminary steps
Ê
"Suspending BitLocker functionality" on page 125
Ê
"Shutting down the server" on page 62
Ê
"Disconnecting the server from the mains" on page 63
Ê
Remove all HDD modules from the server as described in section
"Removing 2.5-inch HDD / SSD modules" on page 210
.
Ê
When working on a rack-mounted server:
"Extending / removing the server from the rack" on page 64
Ê
"Opening the server" on page 68
Ê
"Removing the system air duct" on page 81
Ê
"Removing the system fan holder" on page 330
Upgrade and Repair Unit
(URU)
Average task duration:
20 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Summary of Contents for PRIMERGY RX350 S8
Page 6: ...Upgrade and Maintenance Manual TX300 S8 RX350 S8 ...
Page 44: ...44 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Before you start ...
Page 160: ...160 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Basic software procedures ...
Page 182: ...182 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Power supply ...
Page 320: ...320 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Hard disk drives solid state drives ...
Page 344: ...344 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Fans ...
Page 484: ...484 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Main memory ...
Page 528: ...528 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Processors ...
Page 644: ...644 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Front panel and external connectors ...
Page 792: ...792 Upgrade and Maintenance Manual TX300 S8 RX350 S8 Appendix ...