Commissioning
6. Confirm the selection by clicking on the ‘OK’ button.
Ä
The configuration, L5K file, is imported into a new project as an Ethernet module.
Integrating the configuration into an existing automation project
1. Copy the imported Ethernet module by right-clicking on ‘Ethernet-Modul’ under ‘Ethernet’,
e.g. ETHERNET MODULES Festo_CPX and the ‘Copy’ command.
2. Open the desired project for integration.
3. Integrate the Ethernet module into the project with by right-clicking on ‘Ethernet’ and ‘Paste’.
Ä
All settings are applied to the project.
Transmit configuration
•
Send the configuration to the controller.
8.3.5
Faultless commissioning, normal operating status
After faultless commissioning, specific LED displays on the bus node light. The other LEDs are for
diagnostics and error handling
LED displays
Description
Operating status
PS
PL
SF
MS
NS
TP1
M
TP2
The following LEDs are green:
–
PS
–
PL
–
MS
–
NS
–
TP1
–
TP2
Normal, no error
Tab. 39: Normal operating status of the energy efficiency module on the bus node CPX-FB36
LEDs TP1 and TP2 are steady or flashing if the port is in use.
–
A steady light means the network connection is OK.
–
Flashing means data transfer is in progress.
The SF LED is not on.
The M LED lights or flashes if parameterisation has been changed or forcing is active.
8.4
Commissioning with bus node CPX-M-FB37
For detailed information on commissioning with bus node CPX-FB37, see the documentation for the
bus account
8.5
Commissioning with bus nodes CPX(-M)-FB43/FB44
This section describes the interfaces, DIL switches and display elements of the bus node mentioned
and provides an overview of the configuration and commissioning with this bus node.
For detailed information on the bus node, see the documentation on the bus account