3. Commissioning
3-4
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
Source
Current versions of the GSDML/GSD files for CPX terminals
can be found on the Festo website at:
–
www.festo.com/fieldbus
Import the GSDML/GSD file into the project of the configura-
tion program. After import, you can select the CPX terminal
with the output moduleCPX-FVDA-P2 in the configuration
program and edit it (e.g. set F-parameter).
Configuration, parametrisation and commissioning of the CPX
terminal with CPX-FVDA-P2 are dependent on the control sys-
tem used.
Detailed information can be found in the documentation of
the control system used and in the online help of the config-
uration software used.
Module identifiers
Each module has its own identifier (module identifier).
Apply the module identifiers – from left to right, correspond-
ing to the physical order as installed in the CPX terminal – in
your configuration program.
Module (order code)
Module indicator
1)
Assigned IO bytes
2)
CPX-FVDA-P2
FVDO-P2
6 bytes O + 6 bytes I
1) Module identifier in the operator unit or in the hardware configuration of the programming soft-
ware
2) Four bytes each are used exclusively for PROFIsafe communication
Tab. 3/2:
Module identifier of the output module CPX-FVDA-P2
Summary of Contents for 1971599
Page 2: ......
Page 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Page 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Page 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Page 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Page 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Page 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Page 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...