3. Commissioning
3-16
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
3.6
Configuration with Siemens STEP 7 (example).
The configuration examples shown in this chapter are based
on the use of a Siemens PLC and the Siemens STEP_7 Ver-
sion 5.4 configuration and programming software with Dis-
tributed Safety Version 5.4. PROFInet is used as the bus sys-
tem. Knowledge of how to operate the STEP 7 software is
assumed in the following.
Please inform yourself first in the description for your CPX
bus node about the fundamental procedure for configuration
of a CPX terminal. The information in the following sections
refers exclusively to the output module CPX-FVDA-P2.
After you have installed the GSDML/GSD file and added the
CPX terminal with the configuration software (HW Config) to
the project’s network, you can add the output module to the
configuration table of the CPX terminal (
description of the
CPX bus node).
Then you can set the start addresses for inputs and outputs
as well as the PROFIsafe parameters and the standard mod-
ule parameters.
•
In the configuration table, click on the line of the output
module CPX-FVDA-P2. Then the dialogue window
“Properties – FVDA-P2” appears.
•
Now set the desired start addresses of the inputs and
outputs in the [Addresses] tab of the dialogue window
(
Fig. 3/3).
Summary of Contents for 1971599
Page 2: ......
Page 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Page 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Page 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Page 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Page 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Page 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Page 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...