3. Commissioning
3-6
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
3.3
Commissioning steps
Detailed information on configuration, programming and
commissioning in combination with the F-Host used can be
found in the documentation of the F-Host manufacturer.
Instructions on configuration and commissioning of the CPX
terminal can be found in the description of the CPX bus node.
1. Integrate the GSDML/GSD file into the configuration soft-
ware of the F-Host (
description of the CPX bus node).
2. Configure and parameterise the output module with the
configuration software of the F-Host.
–
Add CPX terminal to the configuration (
description
of the corresponding CPX bus node)
–
Add output module to the CPX configuration
–
Set start address of the inputs and outputs
–
Set PROFIsafe parameter of the output module
(
section 3.4)
–
If necessary, set standard parameters of the output
module (
section 3.5 and 3.5.1)
3. Create and load the safety program.
4. Commission the CPX terminal on the fieldbus (PROFIBUS
or PROFINET IO) and test the characteristics in trial mode.
Summary of Contents for 1971599
Page 2: ......
Page 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Page 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Page 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Page 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Page 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Page 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Page 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...