2. Installation
2-12
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
This is how you set the PROFIsafe address at the DIL switch:
Note
Incorrect handling can cause damage to the electronics
modules.
•
First switch off the supply voltage before conducting any
mounting or installation work.
•
Only switch on the electrical supply voltage when the
product has been fully assembled and all of the installa-
tion work is complete.
1. Switch off the power supplies for the CPX terminal.
2. Remove the mounted connection block (
section 2.5.1).
3. Carefully set the desired PROFIsafe address at the DIL
switch with a suitable tool, e.g. a small watchmaker’s
screwdriver.
When mounting, observe the instruction in section 2.5.2
(threaded connector without distortion, clean connection
surfaces, etc.).
4. Remount the connection block. Tightening torque
Technical data (appendix A.1).
Summary of Contents for 1971599
Page 2: ......
Page 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Page 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Page 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Page 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Page 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Page 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Page 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...