4. Commissioning
4-47
Festo P.BE-VIFB13-03-EN en 0003c
Send parametrizing data
The parameterisation data are transmitted from the DP
master to the valve terminal with the function
Set_Prm
.
Octet 1: Station status
Bit
Meaning
Explanation
0
–
Reserved
1
–
2
–
3
WD_On
Response monitoring of the valve terminal on/off:
log. “0”:
off
log. ”1”:
On
4
Freeze_Req
log. “1”: Activate FREEZE
5
Sync_Req
log. “1”: Activate SYNC
6
Unlock_Req
Bit 7
Bit 6
Explanation
7
Lock_Req
0
0
min T
SDR
+ valve terminal parameter may
be overwritten
0
1
Valve terminal released for other masters
1
0
Valve terminal locked for other masters
1
1
Valve terminal released for other masters
Summary of Contents for 174335
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE VIFB13 03 EN en 0003c...
Page 17: ...Summary of components 1 1 Festo P BE VIFB13 03 EN en 0003c Chapter 1...
Page 26: ...1 Summary of components 1 10 Festo P BE VIFB13 03 EN en 0003c...
Page 27: ...Fitting 2 1 Festo P BE VIFB13 03 EN en 0003c Chapter 2...
Page 37: ...Installation 3 1 Festo P BE VIFB13 03 EN en 0003c Chapter 3...
Page 66: ...3 Installation 3 30 Festo P BE VIFB13 03 EN en 0003c...
Page 67: ...Commissioning 4 1 Festo P BE VIFB13 03 EN en 0003c Chapter 4...
Page 123: ...Diagnosis and error treatment 5 1 Festo P BE VIFB13 03 EN en 0003c Chapter 5...
Page 162: ...5 Diagnosis and error treatment 5 40 Festo P BE VIFB13 03 EN en 0003c...
Page 163: ...Technical appendix A 1 Festo P BE VIFB13 03 EN en 0003c Appendix A...
Page 177: ...Index B 1 Festo P BE VIFB13 03 EN en 0003c Appendix B...
Page 178: ...B Index B 2 Festo P BE VIFB13 03 EN en 0003c...