Service Manual_AVA1_ENG-20220922_I
206
MANUAL PRINTER CLEANING
Recommended cleaning cycle: Every 10000 cards or after each technical hardware
maintenance.
Servicing accessories: Evolis pre-saturated cleaning cards, cotton swabs, wipes, dry air
pressure spray.
Remove cards from the printer.
Cleaning cards can only be used once.
The frequency and quality of cleaning are determining factors to prolong the life of the print
head, printer, prevents printing and feeding issues. Special care should be taken for this
operation. Do not hesitate to use several pre-saturated cleaning cards if necessary.
Blow the different parts of the printer with a dry air pressure spray to remove dust before the
cleaning.
Cleaning cards can leave fine particles on the cleaned rollers. Printing a few cards after cleaning
helps remove them.
Summary of Contents for AV1H0000BD
Page 1: ...Service Manual_AVA1_ENG 20220922_I 1 AVANSIA SERVICE MANUAL...
Page 73: ...Service Manual_AVA1_ENG 20220922_I 73 Drawing 9 HEAT ROLLER CP011845 HEAT ROLLER MODULE S10248...
Page 74: ...Service Manual_AVA1_ENG 20220922_I 74 Drawing 10 DECURL MODULE CP011976 DECURL SPRING CP011978...
Page 76: ...Service Manual_AVA1_ENG 20220922_I 76 Drawing 12 PACKAGING BOX AND FOAM S10205...
Page 109: ...Service Manual_AVA1_ENG 20220922_I 109 Tools required...
Page 118: ...Service Manual_AVA1_ENG 20220922_I 118 6 Move the hinge outwards 7 Remove the two screws...
Page 133: ...Service Manual_AVA1_ENG 20220922_I 133 8 Unplug the two sensors 9 Remove the three screws...
Page 135: ...Service Manual_AVA1_ENG 20220922_I 135 12 Remove the heat roller horizontally...
Page 139: ...Service Manual_AVA1_ENG 20220922_I 139 6 Remove the V ring 7 Remove the axis...
Page 158: ...Service Manual_AVA1_ENG 20220922_I 158 7 Remove the two screws...
Page 167: ...Service Manual_AVA1_ENG 20220922_I 167 13 Unplug these cables 14 Open the cables holder...
Page 221: ...Service Manual_AVA1_ENG 20220922_I 221 8 Close the front cover...
Page 275: ...Service Manual_AVA1_ENG 20220922_I 275 Printer details Ribbon details...
Page 286: ...Service Manual_AVA1_ENG 20220922_I 286 BLOCK PLAN FOR ELECTRIC PARTS...
Page 287: ...Service Manual_AVA1_ENG 20220922_I 287...
Page 288: ...Service Manual_AVA1_ENG 20220922_I 288...
Page 289: ...Service Manual_AVA1_ENG 20220922_I 289...
Page 290: ...Service Manual_AVA1_ENG 20220922_I 290...
Page 291: ...Service Manual_AVA1_ENG 20220922_I 291 MAIN BOARD PLAN...
Page 293: ...Service Manual_AVA1_ENG 20220922_I 293 www evolis com...