2.4.3
Set up Westinghouse Model TC200 veritrim electronics
Before beginning operation, it is important to change the probe heater setpoint of the
existing electronics to support the Rosemount
™
Oxymitter DR In-Situ Oxygen Probe.
To convert the Model TC200 Electronics Package for use with the Rosemount Oxymitter
DR probe, an EPROM change is necessary. The replacement EPROM needed is part number
1M0315G02.
Replace EPROM
Procedure
1. Shut off and lock out power to the electronics package.
2. Open electronics enclosure.
3. On the main PCB, locate and remove old EPROMs, U11 and U12.
Figure 2-18: Main PCB (Model TC200) EPROM Replacement
4. Replace with new EPROMs (part number 1M03154G02), being careful to install U11
and U12 in their proper locations.
5. Close electronics enclosure and power up system.
Reference Manual
Install
00809-0100-4880
October 2019
Rosemount Oxymitter DR
45
Summary of Contents for Rosemount Oxymitter DR
Page 4: ...4 ...
Page 52: ...Startup and operate Reference Manual October 2019 00809 0100 4880 52 Emerson com Rosemount ...
Page 72: ...Troubleshoot Reference Manual October 2019 00809 0100 4880 72 Emerson com Rosemount ...
Page 74: ...Return material Reference Manual October 2019 00809 0100 4880 74 Emerson com Rosemount ...
Page 84: ...Replacement parts Reference Manual October 2019 00809 0100 4880 84 Emerson com Rosemount ...