CAUTION
EQUIPMENT DAMAGE
Ensure that the local power voltage where the unit is to be installed corresponds to the unit’s nominal voltage as given on the
name plate label.
CAUTION
EQUIPMENT DAMAGE
Do not power up or try to operate the analyzer unless it is physically secure and all electrical and pneumatic connections to the
analyzer are in place.
Before commencing the start-up process, it is important to ensure that electrical power, sample gas handling facilities, and
any calibration gases that are required are available to the analyzer.
CAUTION
EQUIPMENT DAMAGE
Additional notes for units with screw-type terminals:
Cables for external data processing must be double-insulated against mains power.
If this is not possible, cables must be laid in such a way as to guarantee a clearance of at least 0.2 in. (5 mm) from power
cables. This clearance must be permanently secured (e.g., with cable ties).
15
Summary of Contents for Rosemount CT5800
Page 20: ...Contents Reference Manual September 2019 00809 0100 5800 xx Emerson com Rosemount ...
Page 34: ...Plan Reference Manual September 2019 00809 0100 5800 34 Emerson com Rosemount ...
Page 60: ...Startup procedure Reference Manual September 2019 00809 0100 5800 60 Emerson com Rosemount ...
Page 90: ...Gas calibration Reference Manual September 2019 00809 0100 5800 90 Emerson com Rosemount ...
Page 168: ...Shutdown procedure Reference Manual September 2019 00809 0100 5800 168 Emerson com Rosemount ...
Page 178: ...Theory of operation Reference Manual September 2019 00809 0100 5800 178 Emerson com Rosemount ...
Page 180: ...Spare parts list Reference Manual September 2019 00809 0100 5800 180 Emerson com Rosemount ...