5.9.8 Procedure – Interval time
Under the Alarms Settings menu, this screen will
appear to set the interval time. Enter the fixed time in
hours between relay activations.
5.9.9 Procedure – On time
Under the Alarms Settings menu, this screen will
appear to set the relay on time. Enter the time in sec-
onds that the relay is activated.
5.9.10 Procedure – Recovery time
Under the Alarms Settings menu, this screen will
appear to set the relay recovery time. Enter time after
the relay deactivation for process recovery.
5.9.11 Procedure – Hold while active
Under the Alarms Settings menu, this screen will
appear to program the feature that Holds the current
outputs while alarms are active. Select to hold the
current outputs for Sensor 1, Sensor 2 or both sensors
while the relay is activated.
5.9.12 Procedure – Simulate
Alarm relays can be manually set for the purposes of
checking devices such as valves or pumps. Under the
Alarms Settings menu, this screen will appear to allow
manual forced activation of the alarm relays. Select
the desired alarm condition to simulate.
5.9.13 Procedure – Synchronize
Under the Alarms Settings menu, this screen will
appear to allow Synchronization of alarms that are set
to interval timers. Select yes or no to Synchronize
two or more timers.
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Alarm1 Interval Time
024.0 hrs
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Alarm1 On-Time
00.00sec
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Alarm1 Recovery
060sec
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Synchronize Timers
yes
No
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Alarm1 Hold while active
Sensor 1
Sensor 2
Both
None
S1: 1.234µS/cm 25.0ºC
S2: 12.34pH 25.0ºC
Simulate Alarm
M
Don’t simulate
De-energize
Energize
Instruction Manual
LIQ-MAN-1056
Section 5.0: Programming the Analyzer - Basics
April 2017
Summary of Contents for Rosemount 1056
Page 4: ...Quick Start Guide Figure A Quick Start Guide ...
Page 5: ...Quick Reference Guide Figure B Model 1056 Menu Tree ...
Page 28: ...20 Instruction Manual LIQ MAN 1056 Section 2 0 Installation April 2017 ...
Page 50: ...42 Instruction Manual LIQ MAN 1056 Section 6 0 Programming the Measurements April 2017 ...
Page 84: ...76 Instruction Manual LIQ MAN 1056 Section 6 0 Programming the Measurements April 2017 ...
Page 122: ...114 Instruction Manual LIQ MAN 1056 Section 7 0 Calibration April 2017 ...
Page 124: ...116 Instruction Manual LIQ MAN 1056 Section 8 0 Return of Material April 2017 ...