Operating & Maintenance Instructions
43
1. Reset Pushbutton 5. Display
2. Display Pushbutton 6. Nameplate
7. IEC 62056-21 Port
3. kvarh pulse LED
4. kWh pulse LED
1
Reset Pushbutton (See Section 15)
2
Display Pushbutton (See Section 15)
3
kvarh Pulse Indicator (See Section 9)
4
kWh Pulse Indicator (See Section 9)
5
Display (See Section 14)
6
Nameplate (See Figure 3)
7
IEC 62056-21 Port (See Section 16)
Module Carrier (Fits under the terminal cover)
Figure 2 – A1120/40 Meter
Summary of Contents for A1120
Page 2: ......
Page 3: ...A1120 40 Programmable Electronic Polyphase Meter Chapter 1 Introduction M181 001 1B 5 2009 ...
Page 4: ...Minor Change Record Date Modification 7 5 2009 Format change ...
Page 8: ......
Page 53: ...Operating Maintenance Instructions 45 Figure 4 Load Curves ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 91: ......
Page 156: ......