Power Master Unit
iii
_________________________________________________________________
Power Master Unit Meter Compatibility
Variants of the A1120/40 Meter that can be
programmed with the Power Master Unit are
shown opposite. This manual is for use with the
A1120 meter and the A1140 load profile meter
only.
See the list below for details of meter variants.
To program an A1700 (Vision) meter or PPM see
manual M120 001 6.
To program an A120 or A140 single phase meter,
see Manual M130 001 3.
For programming meters it is strongly
recommended that only one meter variant is
selected at a time.
If more than one type of meter is selected and a
Scheme is created, scheme parameters applicable
to the lowest specification of meter only will be
programmed to the meter.
A1120/40 Meter Variants
A1120/40 Versions
LM******** - A
Times always show UTC/GMT
LM******** - C
Times (as selected) show GMT/BST
LM*******B -
Import (Wh)
LM*******C -
Import (Wh), Q1 and Q4 (varh)
LM*******D -
Import (Wh), Q1 and Q4 (varh), VA 1
LM*******E -
Import/Export (Wh)
LM*******F -
Import/Export (Wh), Q1, Q2, Q3, Q4 (varh)
LM*******G -
Import/Export (Wh), VA 1/2
LM*******H -
Import/Export (Wh), Q1, Q2, Q3, Q4, (varh), VA 1/2
Summary of Contents for A1120
Page 2: ......
Page 3: ...A1120 40 Programmable Electronic Polyphase Meter Chapter 1 Introduction M181 001 1B 5 2009 ...
Page 4: ...Minor Change Record Date Modification 7 5 2009 Format change ...
Page 8: ......
Page 53: ...Operating Maintenance Instructions 45 Figure 4 Load Curves ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 91: ......
Page 156: ......