iv
A1120/1140 Programmable Polyphase Meter Users Manual
___________________________________________________________________
Software Installation
What you will Need
(Recommended Minimum Specification)
Pentium 3 Processor
256 MB RAM
CD ROM
60 MB free hard disk space
SVGA Display
The Power Master Unit has been developed as a 32-bit Windows
™
application.
As such it should present no problems running on most configurations of Windows NT 4, Windows
2000 and Windows XP.
Several third party software packages (such as CHIRPS) are included in the Power Master Unit. Refer
to their operating instructions/authoring company's to determine their levels of Windows compatibility.
The performance and operation of the Power Master Unit Software will inevitably depend on the way
Windows has been set up on a given PC. There are a number of limitations when using a “single user”
application in a fully networked environment and where the operating system controls the interaction
between an application and the resources of the computer. Wherever possible it is recommended that
the Power Master Unit machine is set to single application/single user mode with all local permissions,
etc. set.
Operating recommendation
It is recommended that the Master Unit is operated using a mouse.
Portable computers should use an external mouse fitted to the mouse port.
The Power Master Unit can be operated from the keyboard if required.
Installing the Software
Before beginning installation, make sure all other programs are closed.
If upgrading the Master Unit to a later version,
ALWAYS make a back up of the database
prior to
beginning the upgrade.
The installation can be halted by clicking on the "Cancel" button on the bottom right of the screen.
To install the software, follow the instructions below:
InstallShield
Click on the Install Software hypertext link in the
Read Me. The InstallShield Wizard will run.
After a short time the screen opposite is displayed.
If the Power Master Unit is not already on your PC a
prompt will be displayed to continue.
Click Upgrade Power Master Unit, Next to continue.
©
Elster Metering Ltd - M181 001 3C - 12/2007
Summary of Contents for A1120
Page 2: ......
Page 3: ...A1120 40 Programmable Electronic Polyphase Meter Chapter 1 Introduction M181 001 1B 5 2009 ...
Page 4: ...Minor Change Record Date Modification 7 5 2009 Format change ...
Page 8: ......
Page 53: ...Operating Maintenance Instructions 45 Figure 4 Load Curves ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 91: ......
Page 156: ......