IL17569C
Page 3-4
FP-5000
Effective Date: 12/05
Page 3-4
For more information visit:
www.eatonelectrical.com
Effective Date: 12/05
Protective Function Pickup Accuracy
Trip Accuracy — Pickup and Trip Time Relative to Programmed:
Trip
Trip Description
Pickup
Trip Time Accuracy
Accuracy
50X-1
Ground Trip (IX IOC)
±0.5%
2
0 to + 2 Cycles or 0.1%, whichever is greater
50X-2
Ground Trip (IX IOC)
±0.5%
2
0 to + 2 Cycles or 0.1%, whichever is greater
50R-1
Ground Trip Residual
±3%
3
0 to + 2 Cycles or 0.1%, whichever is greater
(IR IOC)
50R-2
Ground Trip Residual
±3%
3
0 to + 2 Cycles or 0.1%, whichever is greater
(IR IOC)
50P-1
Phase Trip (Ph IOC)
±0.5%
2
0 to + 2 Cycles or 0.1%, whichever is greater
50P-2
Phase Trip (Ph IOC)
±0.5%
2
0 to + 2 Cycles or 0.1%, whichever is greater
55A
Apparent PF Trip
±0.02
0 to + 0-1.2 Sec.
55D
Apparent PF Reset
±0.02
0 to + 0-1.2 Sec.
59M-1
Voltage Main Over
±0.5%
4
0 to + 2 Cycles or 0.1%, whichever is greater
59N-1
Neutral Overvoltgage
±0.5%
4
0 to + 2 Cycles or 0.1%, whichever is greater
27M-1
Voltage Main Under
±0.5%
4
0 to + 2 Cycles or 0.1%, whichever is greater
32-1
Power
±1%
0 to + 2 Cycles or 0.1%, whichever is greater
32-2
Power
±1%
0 to + 2 Cycles or 0.1%, whichever is greater
59A-1
Voltage Aux. Over
±0.5%
4
0 to + 2 Cycles or 0.1%, whichever is greater
27A-1
Voltage Aux. Under
±0.5%
4
0 to + 2 Cycles or 0.1%, whichever is greater
81O-1
Over Frequency
±0.02 Hz
0 to + 6 Cycles or 0.1%, whichever is greater
81U-1
Under Frequency
±0.02 Hz
0 to + 6 Cycles or 0.1%, whichever is greater
47-1
Voltage Unbalance
±1%
4
0 to + 2 Cycles or 0.1%, whichever is greater
47-2A
Voltage Unbalance
±1%
4
0 to + 2 Cycles or 0.1%, whichever is greater
46-1
Current Unbalance
±1%
2
0 to + 2 Cycles or 0.1%, whichever is greater
46-2A
Current Unbalance
±1%
2
0 to + 2 Cycles or 0.1%, whichever is greater
Time Overcurrent
51P
Phase Trip (Ph TOC)
0.5%
2
+3% or + 2 Cycles, whichever is greater
5
51P2
Phase Trip (Ph TOC)
0.5%
2
+3% or + 2 Cycles, whichever is greater
5
51R
Ground Trip Residual
3%
3
+3% or + 2 Cycles, whichever is greater
5
(IR TOC)
51X
Ground Trip (IX TOC)
0.5%
2
+3% or + 2 Cycles, whichever is greater
5