Maintenance
Operating Instructions 610-10/630-10 - 01.0 - 01/2021
90
Fig. 51: Checking the operating pressure
To set the operating pressure:
1. Pull the pressure controller (1) up.
2. Turn the pressure controller (1) until the pressure gage (2)
indicates the desired operating pressure.
• Increase pressure = turn clockwise
• Reduce pressure = turn counterclockwise
3. Push the pressure controller (1) down.
6.3.2
Draining the water condensation
(1) - Pressure controller
(2) - Pressure gage
①
②
NOTICE
Property damage from excess water condensation!
Too much water condensation can result in damage to the
machine.
If necessary, drain the condensation water as described.
Summary of Contents for 610-10
Page 1: ...610 10 630 10 Operating Instructions...
Page 6: ...Table of Contents 4 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 16: ...Safety 14 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 44: ...Operation Operating Instructions 610 10 630 10 01 0 01 2021 42...
Page 84: ...Settings via software Operating Instructions 610 10 630 10 01 0 01 2021 82...
Page 96: ...Maintenance Operating Instructions 610 10 630 10 01 0 01 2021 94...
Page 112: ...Decommissioning 110 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 116: ...Disposal 114 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 136: ...Troubleshooting Operating Instructions 610 10 630 10 01 0 01 2021 134...
Page 147: ......