91
Control Cable Entry
Bottom entry and top entry can be conducted in control cabinet and there is no need to
move any mechanical parts.
Control cables shall be tied on the wire duct/bracket when cable routing is finished as
shown in Fig.6-15.
Fig.6-15 Control Cable Entry
6-6-7 Protective Grounding Connection
Ensure that ground busbar in each cabinet is reliably interconnected.
Ground busbars between cabinets shall be reliably connected via earth cable of cross
sectional of 50mm
2
as shown in Fig.6-16 after cabinets in place at site.
Make sure reliable connection between grounding cable from customer and main
grounding bus bar in cabinet is made. And cross sectional area of not less than 95mm
²
is recommended.
Fig.6-16 Grounding connection over several cabinets
Top LV cable entry
Wire duct for
bundling cable
Bracket for
bundling cable
Bottom LV cable entry
Summary of Contents for MVF2000 Series
Page 2: ......