8.7.8.6
8.7.8.7
8.7.8.8
8.7.8.9
8.7.9
8.7.9.1
8.7.9.2
8.7.9.3
8.7.9.4
8.7.9.5
8.7.9.6
8.7.9.7
8.7.9.8
8.7.9.9
8.7.9.10
8.8
8.8.1
8.8.2
8.8.3
8.9
9
9.1
9.2
9.3
9.3.1
9.3.2
9.3.3
9.4
9.4.1
9.4.2
9.4.2.1
9.4.2.2
9.4.3
9.4.4
10
10.1
10.2
Changing the HMI Acknowledge Timeout
Changing the Number of Retries to Receive HMI Acknowledgement (P6.7.4)
Examining the Application Page
Checking the Status of an Option Board
Examining the Connected Option Boards
Finding the Option Board Parameters
Further Control Panel Functions
Safety Checks before Starting the Commissioning
Measuring the Cable and Motor Insulation
Insulation Checks of the Motor Cable
Insulation Checks of the Mains Cable
Insulation Checks of the Motor
Testing the AC Drive after Commissioning
Test A: Controls from the Control Terminals
Test B: Control from the Keypad
Preventive Maintenance Recommendations
AQ275638903263en-000601/DPD00910 | 7
Danfoss A/S © 2022.12
Contents
VACON® NXS/NXP Air-cooled
Operating Guide