2.
-
-
-
3.
-
-
To move the cables through the grommets, cut them open. Use the grommets delivered in the accessories bag.
Do not cut the grommet openings wider than what is necessary for the used cables.
If the grommets fold in when putting the cable, pull the cable back to make the grommets straight.
Cable gland can be used if preferred.
e3
0b
h2
77
.1
0
Illustration 29: Cutting the Grommet in IP54
e3
0b
h2
78
.1
0
Attach the grommet and the cable until the frame of the drive goes into the groove of the grommet.
With the protection rating IP54 (UL Type 12), the connection between the grommet and the cable must be tight. Pull
the first bit of the cable out of the grommet until it stays straight.
If it is not possible, make the connection tight with some insulation tape or a cable tie.
e
3
0
b
g
0
7
7
.1
0
AQ275638903263en-000601 / DPD00910 | 67
Danfoss A/S © 2022.12
Electrical Installation
VACON® NXS/NXP Air-cooled
Operating Guide