1. System Configuration
1.1
Operation Instructions
After the installation and test operation of the room air conditioner have been completed, it should be
operated and handled as described below. Every user would like to know the correct method of
operation of the room air conditioner, to check if it is capable of cooling (or heating) well, and to know a
clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time can be
said to reduce about 80% of the requests for servicing. However good the installation work is and
however good the functions are, the customer may blame either the room air conditioner or its
installation work because of improper handling. The installation work and handing over of the unit can
only be considered to have been completed when its handling has been explained to the user without
using technical terms but giving full knowledge of the equipment.
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...