![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977246.webp)
SiE12-411
Outdoor Unit (80 / 90 Class)
Removal Procedure
235
1.8
Removal of Shunt
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
2
Remove 6 screws of
the tie wire presser
plate.
Remove 4 screws of
the right side panel.
"
Fasten the rubber packing
with double-faced adhesive
tape when mounting.
3
Remove the putty.
Caution
Be careful not to get yourself
burnt with the pipes and other
parts that are heated by the gas
welding rod.
Warning
If refrigerant gas leaks during
the job, ventilate the room.
(Bear in mind that if the
refrigerant gas is exposed to
open flames, noxious gas may
be generated.)
"
Before taking this
procedure, make sure
there is no refrigerant gas
left in the refrigerant
pipes.
4
Disconnect the 5
brazed points of the
shunt.
R
ubb
er
p
a
cking
Tie wire pre
ssu
re pl
a
te
Right
s
ide p
a
nel
Br
a
zed point
s
S
h
u
nt
P
u
tty
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...